After you have completed the preparation stage which includes measuring how much artificial grass you need, installing appropriate drainage (if required) and taking out the natural grass layer, you will be able to install your artificial grass lawn. This article outlines the steps you should follow to assist you to complete the job right, from laying the base, connecting joints and preventing weed growth.

Lay Gravel Base followed by Sharp Sand – If required, use treated timber/timber stakes to put within an area frame. We recommend 4 X 2 inches of tantalised treated timber for heavy clay soil areas and poorly draining areas and two X 2 inches of tantalised timber once and for all draining areas. Screw these timbers for the stakes leaving the stakes on the within the perimeter. In case the Artificial Grass meet a concrete path, wall or decking, position the timber flush with the surface height and by using 10mm temporary fillet, pack the timber close to the wall leaving the space to help you tuck the irrigation santa clarita involving the timber and also the adjoining material with a later stage.

Position the stakes from the inner perimeter timber edging and hammer in the ground ensuring the stakes are slightly less than the timber edging. Next screw the timber stake for the timber edging. With heavy clay soils we recommend laying a crushed stone surface as much as 3 inches. This is definitely not necessary for the majority of areas and only required for those who have a higher water table where the ground holds water for long periods of time after it rains. Next compact the floor employing a vibrating plate that can be hired from an equipment hire company. Make sure the perimeter is compacted and below the timber edging by 1 inch. Infill the perimeter with sharp sand and level employing a rake. Guarantee the sand is level to the very top from the timber edging and compact again.

Permanently drainage areas spread a layer of sharp sand to blind over the soil. Next compact the earth employing a vibrating plate that can be hired from an equipment hire company. Ensure the perimeter is compacted and level with the timber edging. Should you put more work in at this stage, your Artificial Grass Lawn can look better consequently.

Weed Control Layer – Apply the weed control geo textile membrane and cut as necessary. Tack using small 1 inch galvanised clout nails for the timber edging. This weed control geo textile membrane prevents any probability of weed growth with the artificial grass drainage holes.

Roll out Artificial Grass – Lay the Artificial Grass within the desired direction working on the carpet and never on the levelled base. Ensure the carpet is positioned to minimise cuts, joints and waste overlaying the timber edging by at least 4 inches. If the artificial grass meets a path or edge, and in case you have laid the timber edging correctly as previously described, then the artificial grass could be wedged between. If joining, please ensure that the artificial grass is laid with the pile running in the same direction on every piece. Lay the carpet on top of the sand rather than dragging it throughout the base material. To aid stop wrinkles or creasing it is advisable to allow 2 to three hours to settle before continuing with jointing and adhesive. Cut grass to shape utilizing a sharp Dolphin or Stanley knife or scissors.

Jointing – When jointing your outdoor carpet together, make sure the pile runs inside the same direction. Stop manufacturer’s edge strip (if present) and butt two edges together ensuring there are no gaps in excess of 1mm in between the two carpet edges. The accuracy with this will determine how visible the join is after the completion. Fold back edges and position jointing tape (smooth side down) so the edges in the carpet satisfy the tape when joined.

Adhesive – a) Apply the cartridge adhesive in a zig zag motion onto the rougher side of the tape allowing one cartridge for every 3 linear metres. Turn down carpet and press both edges to the wet adhesive, ensuring each piece marries up and contains no overlap. As you are accomplishing this along with your fingers, mix the fibres together to conceal the join. After the whole length is at place and also you are happy using its appearance it is necessary to walk over the join several times to activate the glue and bond the grass to the tape. Weigh along the seam to ensure good exposure to the glue until it cures. The more care taken using the operation the neater and tidier the joint will likely be.

b) If utilizing the 2-component multi-purpose adhesive, ensure thorough mixing of the two components before use. Apply adhesive to the rough side from the tape and spread evenly across a width of at the very least 20cm using if possible a notched trowel. Sufficient adhesive ought to be applied so that once the artificial grass carpet is pressed in to the adhesive, a transfer on the carpet backing is complete. Turn down carpet and press both edges into the wet adhesive, ensuring each piece marries up and has no overlap. Ensure that the carpet fails to crest in the seam and is also holding flat over the bonded area. When the whole length is in place and you are pleased featuring its appearance it really is essential to walk along the join repeatedly to activate the glue and bond the grass to the tape. Weight the seam to make sure good irfspy using the glue until it cures. The greater care taken with the operation the neater and tidier the joint will be.

As you should endeavour never to put adhesive to the carpet small quantities of glue can be removed through the artificial grass fibre using White Spirit and a small off cut from the artificial grass. Small amounts of cured glue can usually be removed. To avert this situation and the possibility of damage to the artificial grass, care and precautions should be come to avoid contact with the fibres constantly. If the artificial grass has been jointed and glued and you also are pleased using the levels screw the grass to the timber perimeter framework using galvanised screws at least of 12 inch intervals.

Spread Sand (Optional, based on Grass Selected) – Once the artificial grass has been laid use silica sand, which can be kiln dried and brush into carpet along the way. Each product could have sand infill but this is only utilized to stabilise the carpet and at virtually no time if the sand be visible. You must obtain an even spread on the surface employing a brush to develop the depth in layers. Usually do not apply the sand in a single application. Brush sand into pile right after laying as the artificial grass is dry even though weather conditions are good. Brush vigorously from the fibres in the carpet pile to let the tufts to face upright. Putting the right amount of sand in helps retain the artificial grass to sleep down, protects the fibres as well as keeps them standing to give it the look of real grass.